After repairs costing 5 million tenge, potholes remain at the hydro-engineering facility in Petropavlovsk.
After five days of repairs, a new section of asphalt around 50 metres long has appeared on the bridge of the Petropavlovsk hydroelectric complex. At the same time, the approaches to the structure and the main part of the road on the dam remain covered in deep potholes.
Фонд-бюро расследования коррупции